A cost event might be an issue. It might be tied to material, or a potential change order. It is designed to be whatever you, the contractor, would like to track within a cost code that already exists. This allows you to not have to make a new cost code to track whatever the cost event might be, while still gathering useful information for the time and materials ticket.
To access a cost event:
-
Access job cost by clicking “OPEN” under the job cost module.
-
Click the “COST” tab on the upper left hand corner of the screen.
-
Click “COST EVENT” on the upper left side.